_small.JPG) |
Dan
Cross, Pat Brennan and Paul Fazackerley have visited the DANIEL ADAMSON in
late February to secure the ruder amidships, something which had to be
undertaken before a tow could be undertaken. The rudder had been stuck in the port position. Rain
water which had accumulated in the aft accommodation was pumped out to an
acceptable level which poses no stability / free surface effect problems when
underway. The MSC Assistant Engineer was in attendance to check the work
undertaken. |